Flying a helicopter
Helicopter stories
Accidents
Acronyms
Jobs new
Airliners
Airshows
Future helicopters
For Sale
Contact


Database

47210 serials
20110 photos
4008 heliports



facebook     twitter     google     linkedin


Sponsors

Viewpoint

Saxon


Promote Your Services Here




facebook     twitter     google     linkedin

Sponsored by
Viewpoint Saxon

Promote Here



Latest News

Upgraded MD902 Delivered to CoxHealth

Indra Working on Simulator for Spanish NH90

Two Additional H225 for South Korea Firefighters

Thai Aviation Services Implemented WinAir 7

AC312E Completes Plateau Tests

Russian Helicopters at Milipol 2017

First AW101 Delivered to Norway

GE Begins Production of T408 Engine for CH-53K

25
Liked this

News

CH-53K King Stallion Program Achieves Milestone C


The CH-53K King Stallion successfully passed its Defense Acquisition Board (DAB) review and achieved a Milestone C decision that enables low rate initial production funding


  • CH-53K King Stallion Program Achieves Milestone C


Lockheed Martin, April 04, 2017 - STRATFORD, Conn. - Lockheed Martin today announced the CH-53K King Stallion program successfully passed its Defense Acquisition Board (DAB) review and achieved a Milestone C decision that enables low rate initial production funding.

"This affirmative Milestone C decision validates the maturity and the robust capability of the King Stallion in meeting the United States Marine Corps mission requirements," said Dr. Michael Torok, Sikorsky vice president, CH-53K Programs. "This establishes the CH-53K as a production program and marks another critical step toward our goal of delivering this tremendous capability to the USMC."

Numerous, successfully completed pre-requisites preceded the Milestone C decision. Supplier as well as prime contractor Production Readiness Reviews took place throughout 2016 to establish the program's readiness to move into low rate initial production. Aircraft maturity was established well in advance with over 400 flight hours achieved, and the October 2016 initial Operational Assessment by the USMC fully established the ability of the King Stallion to achieve critical mission flight and ground scenarios in the hands of active duty Marines. Overall, post evaluation interviews of aircrew, ground crew and flight surgeons revealed a high regard for the operational capability demonstrated by the King Stallion.

"We have just successfully launched the production of the most powerful helicopter our nation has ever designed. This incredible positive step function in capability is going to revolutionize the way our nation conducts business in the battlespace by ensuring a substantial increase in logistical throughput into that battlespace. I could not be prouder of our government-contractor team for making this happen," said Col Hank Vanderborght, U.S. Marine Corps program manager for the Naval Air Systems Command's Heavy Lift Helicopters program, PMA-261.

The CH-53K King Stallion provides unmatched heavy lift capability with three times the lift of the CH-53E that it replaces. With more than triple the payload capability and a 12-inch wider internal cabin compared to the predecessor, the King Stallion's increased payloads can range from multiple US Air Force standard 463L pallets to an internally loaded High Mobility Multipurpose Wheeled Vehicle (HMMWV) or a European Fennek armored personnel carrier, to up to three independent external loads at once. This provides extraordinary mission flexibility and system efficiency.

The King Stallion also offers enhanced safety features for the warfighter, including full authority fly-by-wire flight controls and mission management that reduce pilot workload and enable the crew to focus on mission execution as the King Stallion all but "flies itself." Other features include advanced stability augmentation, flight control modes that include attitude command-velocity hold, automated approach to a stabilized hover, position hold and precision tasks in degraded visual environments, and tactile cueing that all permit the pilot to focus confidently on the mission at hand.

Further, the CH-53K King Stallion has improved reliability and maintainability that exceeds 89% mission reliability with a smaller shipboard logistics footprint than the legacy CH-53E.
The U.S. Department of Defense's Program of Record remains at 200 CH-53K aircraft. The first six of the 200 are under contract and scheduled to start delivery next year to the USMC. Two additional aircraft, the first LRIP aircraft, are under long lead procurement for parts and materials, with deliveries scheduled to start in 2020. The Marine Corps intends to stand up eight active duty squadrons, one training squadron, and one reserve squadron to support operational requirements.

About Lockheed Martin: Headquartered in Bethesda, Maryland, Lockheed Martin (NYSE: LMT) is a global security and aerospace company that employs approximately 97,000 people worldwide and is principally engaged in the research, design, development, manufacture, integration and sustainment of advanced technology systems, products and services.


This article is listed in :
Sikorsky CH-53K King Stallion in USUS Marine Corps

Sponsors

Viewpoint

Saxon


Promote Your Services Here




facebook     twitter     google     linkedin

Sponsored by
Viewpoint Saxon

Promote Here