Satellite and aerial maps of Sofia OWF with nearby locations
| Nearby locations | Km | Bearing | |
|---|---|---|---|
| | 31.9 | 219 | UK80 |
| | 35.1 | 267 | UK0V |
| | 47.0 | 175 | |
| | 62.0 | 175 | MMHP |
| | 62.3 | 164 | |
| | 65.1 | 209 |
Sofia OWF |
| 54° 59' 23.77'' N 2° 13' 44.40'' E | ||
| Dogger Bank, Offshore UK | ||
| ICAO: | IATA: | Local: UK1G |
During 2017, the Dogger Bank Teesside B project was renamed Sofia. The OWF will consist of 100 turbines covering c 595 km2, in c 15 metres of water. Power generated will be sent via a pair of 120nm long cables to the onshore converter site near Lazenby. Once operational (due 2026), the site will be remotely controlled from Grimsby.
Sofia OWF News |

