helis.com News Tracker

Leviathan Production Platform

Leviathan Platform

LPP

IL Levant Basin, Block 35, off Dor, Offshore Israel

32.605556, 34.788889 · 154 feet

2019-

Oil and Gas Energy Industry

Location Tracking

Israel

Nearby Locations

Km
Atlit 16.7 057°
Haifa Naval Base ILHFA 31.5 039°
Haifa Uri Michaeli International Airport LLHA 32.9 046°
Ramat David AB LLRD 37.2 080°
Megiddo LLMG 41.2 091°
Herzlyia LLHZ 47.5 175°
The Leviathan Production Platform (LPP) is a near-shore processing facility taking Gas from the Leviathan field, a further 60nm NW of the platform. The Leviathan field was discovered in Jun 2010 within Miocene and Oligocene formations and 4 wells in the field (in Block 1/14 in the Levant Basin) are connected to a seafloor manifold, which is then connected onward to the LPP much closer inshore. Production started on 21 Dec 2019.