The Changfang Ph 1 windfarm consists of 10 turbines spread across 18 km2 in waters between c 10m and 20m deep, generating 95MW. The 2 cables make landfall near Lukang. The system is due to commission in 2024 and will be remotely controlled and maintained from Taichung.