helis.com Tracker

Changfang Phase 1 Offshore Wind Farm

Changfang Ph 1 OWF

TW73

2024-

Wind energy industry

TW 27nm SW of Taichung, Formosa Strait

24.034512, 120.170998
Location Tracking

Taiwan

Nearby Locations

Km
Changhua Demonstration Offshore Wind Farm TW24 8.9 126°
Zhong Neng Offshore Wind Farm TW52 15.6 193°
Greater Changhua 1 - South East Offshore Wind Farm TW38 21.8 308°
Greater Changhua 2a South West Offshore Wind Farm TW37 37.7 295°
Taichung International Airport RCMQ 52.3 061°
Chiayi AB RCKU 67.6 160°
The Changfang Ph 1 windfarm consists of 10 turbines spread across 18 km2 in waters between c 10m and 20m deep, generating 95MW. The 2 cables make landfall near Lukang. The system is due to commission in 2024 and will be remotely controlled and maintained from Taichung.