Deutsche Bucht OWF consists of 31 turbines in c 35m of water spread over 17.5 sq km, commissioned in Sep 2019 after first power was produced in Jul 2019. Although situated within the German Exclusive Economic Zone, Air Traffic operates within the Amsterdam FIR.